Installation
1UR-FSE ENGINE CONTROL SYSTEM: INTEGRATION RELAY: INSTALLATION
1. INSTALL INTEGRATION NO.1 RELAY
(a) Connect the 3 connectors.
(b) Attach the integration relay to the engine room No. 2 relay block.
(c) Install the engine engine room No. 1 relay block cover.
2. INSTALL ENGINE ROOM SIDE COVER LH Installation
3. INSTALL COOL AIR INTAKE DUCT SEAL Installation
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.