Installation
METER / GAUGE / DISPLAY: HEADUP DISPLAY: INSTALLATION
1. INSTALL METER MIRROR SUB-ASSEMBLY
(a) Temporarily install the meter mirror sub-assembly with the 3 nuts.
(b) Tighten the 3 nuts to install the meter mirror sub-assembly.
HINT
Tighten the bolts in the order shown in the illustration.
Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)
(c) Connect the connector.
(d) Engage the clamp.
2. INSTALL UPPER INSTRUMENT PANEL ASSEMBLY
(a) Install the upper instrument panel assembly Installation.