Installation
SLIDING ROOF / CONVERTIBLE: METAL TOP ROOF CONTROL COMPUTER: INSTALLATION
1. INSTALL SLIDING ROOF CONTROL ECU ASSEMBLY
(a) Install the sliding roof control ECU assembly with the 2 nuts and bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect each connector.
2. INSTALL FRONT LUGGAGE COMPARTMENT TRIM COVER Installation
3. INSTALL SLIDING ROOF GUIDE RAIL STOPPER Installation
4. INSTALL TONNEAU COVER HOOK HOLDER Installation
5. INSTALL TONNEAU COVER ASSEMBLY Installation
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
7. INSPECT SRS WARNING LIGHT
Diagnosis System
8. INSPECT RETRACTABLE HARDTOP SYSTEM Installation