Operation CHARM: Car repair manuals for everyone.

Installation





4GR-FSE ENGINE CONTROL: AIR FUEL RATIO SENSOR: INSTALLATION

1. INSTALL AIR FUEL RATIO SENSOR (for Bank 2 Sensor 1)

(a) Using SST, install the air fuel ratio sensor (for Bank 2 Sensor 1) to the exhaust manifold LH.





SST : 09224-00010

without SST - Torque : 44 Nm (449 kgf-cm, 32 ft-lbf)

with SST - Torque : 40 Nm (408 kgf-cm, 30 ft-lbf)

NOTICE:
* The "with SST" torque value is effective when using SST with a fulcrum length of 30 mm (1.18 in.).
* The "with SST" torque value is effective when using a torque wrench with a fulcrum length of 300 mm (11.81 in.) Service Precautions.
* This torque value is effective when SST is parallel to the torque wrench.

2. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH Installation

3. INSTALL NO. 3 ENGINE ROOM RELAY BLOCK ASSEMBLY Installation

4. INSTALL AIR FUEL RATIO SENSOR (for Bank 1 Sensor 1)

(a) Using SST, install the air fuel ratio sensor connector (for Bank 1 Sensor 1) to the exhaust manifold RH.





SST : 09224-00010

without SST - Torque : 44 Nm (449 kgf-cm, 32 ft-lbf)

with SST - Torque : 40 Nm (408 kgf-cm, 30 ft-lbf)

NOTICE:
* The "with SST" torque value is effective when using SST with a fulcrum length of 30 mm (1.18 in.).
* The "with SST" torque value is effective when using a torque wrench with a fulcrum length of 300 mm (11.81 in.).
* This torque value is effective when SST is parallel to the torque wrench.

(b) Connect the 2 clamps and air fuel ratio sensor connector (for Bank 1 Sensor 1).





5. INSTALL NO. 4 ENGINE WIRE

(a) Connect the connector and install the 2 clamps.





(b) Connect the No. 1 engine wire to the engine room No. 1 junction block. Then, install it with the nut.

Torque : 12 Nm (124 kgf-cm, 9 ft-lbf)

(c) Install the engine room No. 1 relay block cover.

6. INSTALL BATTERY TRAY

(a) Install the battery tray with the 3 bolts.





Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)

7. INSTALL POWER STEERING ECU ASSEMBLY

(a) Install the power steering ECU assembly Installation.

8. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE Installation

9. INSTALL NO. 1 EXHAUST PIPE SUPPORT BRACKET SUB-ASSEMBLY (for Automatic Transmission) Installation

10. INSTALL FRONT EXHAUST PIPE ASSEMBLY Installation

11. INSTALL FRONT CENTER FLOOR BRACE Installation

12. INSTALL REAR BODY SUPPORT BRACKET Installation

13. INSTALL NO. 2 ENGINE UNDER COVER

14. INSTALL NO. 1 BODY MOUNTING BRACKET SUB-ASSEMBLY LH Installation

15. INSTALL NO. 1 BODY MOUNTING BRACKET SUB-ASSEMBLY RH Installation

16. INSTALL NO. 2 FLOOR UNDER COVER Installation

17. INSTALL NO. 1 FLOOR UNDER COVER Installation

18. INSTALL FRONT FLOOR COVER LH Installation

19. INSTALL FRONT FLOOR COVER RH Installation

20. INSTALL ENGINE UNDER COVER

21. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

22. INSPECT FOR EXHAUST GAS LEAK

23. INSTALL V-BANK COVER SUB-ASSEMBLY Installation

24. INSTALL ENGINE ROOM SIDE COVER LH Installation

25. INSTALL ENGINE ROOM SIDE COVER Installation

26. INSTALL COOL AIR INTAKE DUCT SEAL Installation