Installation
A960E AUTOMATIC TRANSMISSION / TRANSAXLE: SHIFT LEVER: INSTALLATION
1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
(a) Install the floor shift assembly with the 4 bolts.
Torque : 8.3 Nm (85 kgf-cm, 73 in-lbf)
(b) Connect the 2 connectors and 4 clamps to the floor shift assembly.
2. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
(a) Install the floor shift gear shifting rod sub-assembly with the nut.
Torque : 13 Nm (130 kgf-cm, 9 ft-lbf)
3. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR Installation
4. INSTALL FRONT EXHAUST PIPE ASSEMBLY
Installation
5. INSTALL NO. 2 CONSOLE BOX DUCT Installation
6. INSTALL CONSOLE BOX Installation
7. INSTALL CONSOLE BOX REGISTER ASSEMBLY Installation
8. INSTALL REAR ASH RECEPTACLE ASSEMBLY Installation
9. INSTALL FRONT ASH RECEPTACLE ASSEMBLY Installation
10. INSTALL CONSOLE PANEL SUB-ASSEMBLY Installation
11. INSTALL UPPER NO. 2 CONSOLE PANEL GARNISH Installation
12. INSTALL UPPER NO. 1 CONSOLE PANEL GARNISH Installation
13. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY Installation
14. INSPECT SHIFT LEVER POSITION On-Vehicle Inspection
15. ADJUST SHIFT LEVER POSITION A960E Automatic Transmission
16. INSPECT FOR EXHAUST GAS LEAK