Installation
2GR-FSE ENGINE MECHANICAL: ENGINE UNIT: INSTALLATION
1. INSTALL ENGINE COOLANT TEMPERATURE SENSOR
(a) Install the temperature sensor.
Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)
2. INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY
(a) Apply adhesive to 2 or 3 threads of the oil pressure switch.
Text in Illustration
Adhesive:
Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
(b) Using a 24 mm deep socket wrench, install the oil pressure switch.
Torque : 15 Nm (153 kgf-cm, 11 ft-lbf)
NOTICE:
Do not start the engine within 1 hour after installation for prevent oil leaks.
3. INSTALL ENGINE OIL LEVEL SENSOR
(a) Install the engine oil level sensor and a new gasket with the 4 bolts.
Torque : 7.0 Nm (71 kgf-cm, 62 in-lbf)
4. INSTALL IGNITION COIL ASSEMBLY
(a) Install the 6 ignition coils with the 6 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
5. INSTALL V-BANK COVER BRACKET SUB-ASSEMBLY
(a) Install the V-bank cover bracket with the bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
6. INSTALL FUEL INJECTOR ASSEMBLY Installation
7. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY Installation
8. INSTALL NO. 2 FUEL DELIVERY PIPE SUB-ASSEMBLY Installation
9. INSTALL NO. 3 FUEL PIPE SUB-ASSEMBLY Installation
10. INSTALL NO. 2 FUEL PIPE Installation
11. INSTALL FUEL PUMP ASSEMBLY Installation
12. CONNECT NO. 2 FUEL PIPE Installation
13. INSTALL NO. 1 FUEL PIPE Installation
14. INSTALL FUEL PRESSURE PULSATION DAMPER ASSEMBLY Installation
15. INSTALL WATER HOSE JOINT
(a) Connect the 2 hoses, and install the bolt and water hose joint.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
16. INSTALL FUEL TUBE SUB-ASSEMBLY
(a) Install the 2 bolts and fuel tube sub-assembly.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
17. INSTALL INTAKE MANIFOLD
(a) Set a new gasket on each cylinder head.
NOTICE:
* Align the port holes of the gasket and cylinder head.
* Make sure that the gasket is installed in the correct direction.
(b) Set the intake manifold on the cylinder heads.
(c) Install and tighten the 6 bolts and 4 nuts uniformly in several steps.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
18. INSTALL INTAKE AIR SURGE TANK ASSEMBLY Installation
19. INSTALL THROTTLE BODY Installation
20. INSTALL INJECTOR DRIVER
(a) Install the injector driver with the bolt and 2 nuts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
21. INSTALL ENGINE WIRE
(a) Install the engine wire.
22. INSTALL WATER PUMP PULLEY Installation
23. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
(a) Temporarily install the V-ribbed belt tensioner with the 5 bolts.
Each bolt length is as follows:
(b) Install the V-ribbed belt tensioner by tightening the bolt 1 and bolt 2 in the order shown in the illustration.
Torque : 43 Nm (439 kgf-cm, 32 ft-lbf)
(c) Tighten the other bolts.
Torque : 43 Nm (439 kgf-cm, 32 ft-lbf)
24. INSTALL ENGINE MOUNTING BRACKET LH
(a) Install the mounting bracket LH with the 4 bolts.
Torque : 43 Nm (439 kgf-cm, 32 ft-lbf)
(b) Connect the 2 clamps.
25. INSTALL ENGINE MOUNTING BRACKET RH
(a) Install the mounting bracket RH with the 4 bolts.
Torque : 43 Nm (439 kgf-cm, 32 ft-lbf)
26. INSTALL COOLER COMPRESSOR ASSEMBLY Installation
27. INSTALL GENERATOR ASSEMBLY Installation
28. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
(a) Install the plate and idler pulley with the bolt.
Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)
29. INSTALL NO. 1 ENGINE COVER
(a) Install the No. 1 engine cover with the 3 clips.
30. INSTALL NO. 2 ENGINE COVER
(a) Install the No. 2 engine cover with the 3 clips.
(b) Connect the clamp.
31. INSTALL V-RIBBED BELT Installation
32. INSTALL ENGINE HANGERS
(a) Install the 2 engine hangers with the 4 bolts.
Text in Illustration
Torque : 33 Nm (336 kgf-cm, 24 ft-lbf)
Part No.