Operation CHARM: Car repair manuals for everyone.

Installation





2GR-FSE ENGINE CONTROL: IGNITION COIL AND SPARK PLUG: INSTALLATION

1. INSTALL SPARK PLUG

(a) Install the 6 spark plugs.

Torque : 18 Nm (184 kgf-cm, 13 ft-lbf)

2. INSTALL IGNITION COIL ASSEMBLY

(a) Install the 6 ignition coils with the 6 bolts.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

(b) Connect the 6 ignition coil connectors.

(c) Connect the 3 wire harness clamps and the noise filter connector.





3. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE Installation

4. INSTALL NO. 2 VENTILATION HOSE Installation

5. INSTALL ENGINE ROOM SIDE COVER LH Installation

6. INSTALL ENGINE ROOM SIDE COVER Installation

7. INSTALL COOL AIR INTAKE DUCT SEAL Installation

8. INSTALL V-BANK COVER SUB-ASSEMBLY Installation