Operation CHARM: Car repair manuals for everyone.

Installation





2UR-GSE LUBRICATION: SCAVENGING PUMP: INSTALLATION

1. INSTALL SCAVENGING PUMP ASSEMBLY

(a) Temporarily install the scavenging pump assembly and a new gasket with the 6 bolts.

(b) Using several steps, uniformly install and tighten the 6 bolts in the sequence shown in the illustration.





Torque : 23 Nm (235 kgf-cm, 17 ft-lbf)

2. INSTALL NO. 3 OIL PIPE

(a) Install a new O-ring to the No. 3 oil pipe.

(b) Connect the No. 3 oil pipe to the scavenging pump assembly and align the bolt holes.

NOTICE:
* Be careful not to damage the O-ring.
* Do not rotate the oil pipe when connecting it to the scavenging pump.

(c) Install the No. 3 oil pipe with the 2 bolts.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

3. INSTALL NO. 2 OIL PIPE

(a) Install a new O-ring and oil pipe seal to the No. 2 oil pipe.

(b) Connect the No. 2 oil pipe to the scavenging pump assembly and align the bolt holes.

NOTICE:
* Be careful not to damage the O-ring.
* Do not rotate the oil pipe when connecting it to the scavenging pump.

(c) Install the No. 2 oil pipe with the 2 bolts.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

4. INSTALL NO. 1 OIL PIPE

(a) Install a new O-ring and oil pipe seal to the No. 1 oil pipe.

(b) Connect the No. 1 oil pipe to the scavenging pump assembly and align the bolt holes.

NOTICE:
* Be careful not to damage the O-ring.
* Do not rotate the oil pipe when connecting it to the scavenging pump.

(c) Install the No. 1 oil pipe with the 2 bolts.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

5. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY

HINT
Installation