Installation
AA80E AUTOMATIC TRANSMISSION / TRANSAXLE: SHIFT LEVER: INSTALLATION
1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
(a) Install the floor shift assembly with the 4 bolts.
Torque : 8.3 Nm (85 kgf-cm, 73 in-lbf)
(b) Connect the 4 clamps to the floor shift assembly.
(c) Connect the 2 connectors to the floor shift assembly.
2. CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
(a) Temporarily tighten the floor shift gear shifting rod with the nut.
HINT
The rod is tightened to a torque specification in the "ADJUST SHIFT LEVER POSITION" procedure.
3. ADJUST SHIFT LEVER POSITION Adjustments
4. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR Installation
5. INSTALL FRONT EXHAUST PIPE ASSEMBLY Installation
6. CONNECT HEATED OXYGEN SENSOR Installation
7. INSTALL FRONT CENTER FLOOR BRACE Installation
8. INSTALL REAR NO. 1 FLOOR PANEL BRACE Installation
9. INSTALL TAIL EXHAUST PIPE ASSEMBLY Installation
10. INSTALL NO. 2 FLOOR UNDER COVER Installation
11. INSTALL NO. 1 FLOOR UNDER COVER Installation
12. INSTALL NO. 2 CONSOLE BOX DUCT Installation
13. INSTALL CONSOLE BOX Installation
14. INSTALL CONSOLE BOX REGISTER ASSEMBLY (w/ Ashtray) Installation
15. INSTALL CONSOLE BOX REGISTER ASSEMBLY (w/o Ashtray) Installation
16. INSTALL REAR ASH RECEPTACLE ASSEMBLY (w/ Ashtray) Installation
17. INSTALL FRONT ASH RECEPTACLE BOX SUB-ASSEMBLY (w/ Ashtray) Installation
18. INSTALL INSTRUMENT PANEL BOX ASSEMBLY (w/o Ashtray) Installation
19. INSTALL CONSOLE PANEL SUB-ASSEMBLY Installation
20. INSTALL UPPER NO. 2 CONSOLE PANEL GARNISH Installation
21. INSTALL UPPER NO. 1 CONSOLE PANEL GARNISH Installation
22. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY Installation
23. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
24. INSPECT SHIFT LEVER POSITION Initial Inspection and Diagnostic Overview
25. INSPECT FOR EXHAUST GAS LEAK