P0ADB
HYBRID / BATTERY CONTROL: HYBRID CONTROL SYSTEM: P0ADB-227: Hybrid Battery Positive Contactor Control Circuit Low
P0ADB-227 - Hybrid Battery Positive Contactor Control Circuit Low
DESCRIPTION
Refer to the description for DTC P0AE6-225 P0AE6.
WIRING DIAGRAM
Refer to the wiring diagram for DTC P0AE6-225 P0AE6.
INSPECTION PROCEDURE
CAUTION:
- Before inspecting the high-voltage system or disconnecting the low voltage connector of the inverter with converter assembly, take safety precautions such as wearing insulated gloves and removing the service plug grip to prevent electrical shocks. After removing the service plug grip, put it in your pocket to prevent other technicians from accidentally reconnecting it while you are working on the high-voltage system.
- After removing the service plug grip, wait for at least 10 minutes before touching any of the high-voltage connectors or terminals. After waiting for 10 minutes, check the voltage at the terminals in the inspection point in the inverter with converter assembly. The voltage should be 0 V before beginning work Hybrid Control System: Precaution.
HINT
Waiting for at least 10 minutes is required to discharge the high-voltage capacitor inside the inverter with converter assembly.
NOTICE:
After turning the power switch off, waiting time may be required before disconnecting the cable from the negative (-) auxiliary battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) auxiliary battery terminal notices before proceeding with work Service Precautions.
PROCEDURE
1. CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - BODY GROUND)
(a) Disconnect connector H3 from the power management control ECU.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Text in Illustration
(c) Connect the power management control ECU connector.
NG -- CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - HYBRID BATTERY JUNCTION BLOCK)
OK -- REPLACE POWER MANAGEMENT CONTROL ECU Components
2. CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - HYBRID BATTERY JUNCTION BLOCK)
CAUTION:
Be sure to wear insulated gloves.
(a) Check that the service plug grip is not installed.
NOTICE:
After removing the service plug grip, do not turn the power switch on (READY), unless instructed by the repair manual because this may cause a malfunction.
(b) Remove the upper hybrid battery cover sub-assembly.
(c) Disconnect connector i3 from the hybrid battery junction block assembly.
(d) Disconnect connector H3 from the power management control ECU.
(e) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Text in Illustration
(f) Connect the power management control ECU connector.
(g) Connect the hybrid battery junction block assembly connector.
(h) Install the upper hybrid battery cover sub-assembly.
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- REPLACE HYBRID BATTERY JUNCTION BLOCK ASSEMBLY Components