Operation CHARM: Car repair manuals for everyone.

Inspection





2ZR-FXE ENGINE CONTROL: CAMSHAFT OIL CONTROL VALVE: INSPECTION

1. INSPECT CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





If the result is not as specified, replace the oil control valve assembly.

(b) Check the operation.

(1) Connect a positive (+) auxiliary battery lead to terminal 1 and a negative (-) lead to terminal 2, and check the movement of the valve.





Text in Illustration





NOTICE:
Confirm that the valve moves freely and does not stick in any position.

If necessary, replace the camshaft timing oil control valve assembly.

HINT
Accumulation of foreign matter can cause minor pressure leaks. Minor pressure leaks will cause the camshaft to advance or retard, and this will cause a DTC to be stored.