Operation CHARM: Car repair manuals for everyone.

Installation





2GR-FE IGNITION: IGNITION COIL AND SPARK PLUG: INSTALLATION

1. INSTALL SPARK PLUG

(a) Install the 6 spark plugs.

Torque : 18 Nm (184 kgf-cm, 13 ft-lbf)

2. INSTALL IGNITION COIL ASSEMBLY

(a) Install the 6 ignition coils with the 6 bolts.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

(b) Connect the 6 ignition coil connectors.

3. INSTALL NO. 1 SURGE TANK STAY

NOTICE:

DO NOT apply oil to the bolt listed below:





(a) Install the No. 1 surge tank stay with the bolt.





Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)

(b) Install the bolt and clamp.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

4. INSTALL INTAKE AIR SURGE TANK ASSEMBLY Installation

5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation

6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Installation

7. ADD ENGINE COOLANT Testing and Inspection

8. CHECK FOR ENGINE COOLANT LEAKS Testing and Inspection

9. INSTALL FRONT SUSPENSION UPPER CENTER BRACE Installation

10. INSTALL V-BANK COVER SUB-ASSEMBLY Installation

11. INSTALL ENGINE ROOM SIDE COVER LH Installation

12. INSTALL ENGINE ROOM SIDE COVER RH Installation

13. INSTALL COOL AIR INTAKE DUCT SEAL Installation

14. PERFORM INITIALIZATION

(a) Perform initialization procedure Repair Instruction - Initialization.

NOTICE:
Some vehicle systems require initialization after reconnecting the cable to the negative battery terminal.