Installation
HYBRID / BATTERY CONTROL: SUB RADIATOR: INSTALLATION
1. INSTALL RADIATOR ASSEMBLY
(a) Install the radiator assembly with the 4 bolts.
Torque : 9.0 Nm (92 kgf-cm, 80 in-lbf)
(b) Connect the 2 water hoses and engage the 2 clips.
Text in Illustration
NOTICE:
Make sure that the matchmarks are facing upward.
2. INSTALL RADIATOR SIDE DEFLECTOR RH Installation
3. INSTALL NO. 2 FAN SHROUD
HINT
Installation.
4. ADD COOLANT (for Inverter) Coolant (for Inverter)
5. INSPECT FOR COOLANT LEAK (for Inverter) Testing and Inspection
6. INSTALL NO. 1 ENGINE UNDER COVER