Installation
AIR CONDITIONING: WATER HOSE JOINT: INSTALLATION
1. INSTALL WATER HOSE JOINT
(a) Connect the 2 hoses, and install the water hose joint with the 2 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
2. INSTALL WATER BY-PASS GLOW PLUG Installation
3. INSTALL HEATER WATER INLET HOSE Installation
4. INSTALL HEATER WATER OUTLET HOSE Installation
5. INSTALL V-BANK COVER SUB-ASSEMBLY (for 2GR-FSE) Installation
6. INSTALL V-BANK COVER SUB-ASSEMBLY (for 4GR-FSE) Installation
7. ADD ENGINE COOLANT (for 2GR-FSE) Testing and Inspection
8. ADD ENGINE COOLANT (for 4GR-FSE) Testing and Inspection
9. WARM UP ENGINE Service and Repair
10. INSPECT FOR COOLANT LEAK (for 2GR-FSE) Testing and Inspection
11. INSPECT FOR COOLANT LEAK (for 4GR-FSE) Testing and Inspection