Installation
1UR-FSE IGNITION: IGNITION COIL AND SPARK PLUG: INSTALLATION
1. INSTALL SPARK PLUG
(a) Using a 16 mm plug wrench, install the 8 spark plugs.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
2. INSTALL IGNITION COIL ASSEMBLY
(a) Perform a visual inspection of the spark plug tube gasket.
Standard:
If the result is not as specified, replace the spark plug tube gasket.
(b) Slide the spark plug tube gasket onto the ignition coil as shown in the illustration.
(c) After installing the spark plug tube gasket, firmly insert the ignition coil as shown in the illustration.
(d) Install the 8 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(e) Connect the 8 ignition coil connectors.
3. INSTALL NO. 6 ENGINE COVER SUB-ASSEMBLY (for AWD)
(a) Install the No. 6 engine cover with the 2 nuts.
Torque : 15 Nm (153 kgf-cm, 11 ft-lbf)
4. INSTALL NO. 5 ENGINE COVER SUB-ASSEMBLY (for AWD)
(a) Install the No. 5 engine cover with the 2 nuts.
Torque : 15 Nm (153 kgf-cm, 11 ft-lbf)
5. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE (for AWD) Installation
6. CONNECT ENGINE WIRE
(a) Install the engine wire to the No. 1 relay block with the nut.
Torque : 13 Nm (127 kgf-cm, 9 ft-lbf)
(b) Connect the 2 clamps.
(c) Install the No. 1 relay block cover.
7. INSTALL BATTERY TRAY
(a) Install the battery tray with the 3 bolts.
Torque : 5.4 Nm (55 kgf-cm, 47 in-lbf)
8. INSTALL BATTERY
(a) Install the battery.
(b) Install the battery insulator.
(c) Install the battery clamp with the nut.
Torque : 5.4 Nm (55 kgf-cm, 47 in-lbf)
(d) Connect the battery cable clamp.
(e) Connect the cable to the positive (+) battery terminal.
Torque : 5.4 Nm (55 kgf-cm, 47 in-lbf)
9. INSTALL SKID CONTROL ECU BRACKET Installation
10. INSTALL SKID CONTROL ECU Installation
11. INSTALL AIR CLEANER ASSEMBLY RH Installation
12. INSTALL AIR CLEANER ASSEMBLY LH Installation
13. INSTALL INTAKE AIR CONNECTOR PIPE Installation
14. INSTALL NO. 1 AIR CLEANER INLET Installation
15. INSTALL ENGINE ROOM SIDE COVER RH Installation
16. INSTALL ENGINE ROOM SIDE COVER LH Installation
17. INSTALL AIR CLEANER INLET COVER Installation
18. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
19. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
20. INSTALL COWL TOP VENTILATOR LOUVER RH Installation