Control Assembly, HVAC
REMOVAL1. Disconnect battery ground cable.
2. Pry the LH and RH instrument panel shelf moulding up to disengage the clips and remove the mouldings (illustration).
3. Remove instrument panel cluster opening finish panel retaining screws and remove panel.
4. Remove four Torx head screws retaining control assembly. Pull control assembly away from instrument panel into a position which provides access to rear connections.
5. Disconnect two harness connectors from control assembly by depressing latches at top of connectors and pulling (illustration).
6. Remove nuts retaining vacuum harness to control assembly. Remove control assembly from instrument panel.
INSTALLATION
1. Connect two electrical harness connectors to control assembly. Push keyed connectors in until a click is heard.
2. Attach vacuum harness to vacuum port assembly. Secure harness by tightening two nuts.
3. Position control assembly into instrument panel opening and install four Torx head screws. Ensure that, as control is positioned, locating posts are correctly aligned with their respective holes.
4. Carefully place instrument panel cluster opening finish panel into its assembly position. Note that spring clips are aligned with their proper holes. Press applique into place. Ensure that all spring clips and screws are secure.
5. Install the LH and RH shelf mouldings.
6. Connect battery ground cable and check system operation.