Operation CHARM: Car repair manuals for everyone.

EC3 Checking Wiring Harness



^ Using an analog ohmmeter. measure and record the following:

^ Connect positive lead to ohmmeter to wiring harness connector Pin 41 (Circuit 429) and negative lead to Pin 40 (Circuit 430G).

^ Connect positive lead of ohmmeter to wiring harness connector Pin 40 (Circuit 430G) and negative lead to Pin 41 (Circuit 429).

^ Is at least one of the two ohmmeter readings greater than 8 ohms?

YES -- Go to EC5.

NO -- Go to EC4.