Instructions For Using Pinpoint Tests
Prior to beginning any system testing:1. Check horn and stop lamp for operation.
2. Check all system wiring and electrical connectors.
3. Check throttle linkage and actuator cable for proper adjustment and smooth operation.
Servo Conector Terminal Identification.:
Refer to servo connector terminal identification when performing system diagnosis and testing, and to diagnosis by symptom charts to determine the correct pinpoint test.