Test H
PINPOINT TEST H: INSUFFICIENT, ERRATIC OR NO HEATTest H1-H4:
Test H5-H7:
Test H8-H9:
Test H10-H11:
Test H12-H13:
Test H13-H14:
Test H14-H15:
Test H16:
Normal Operation
Under normal operation, the coolant control valve receives battery voltage through circuit 30-FB3 (RD/OG). The coolant control valve is provided a ground through circuit 91S-FB3 (BN/BL) and/or 91S-FB4 (BN/GN) from the Dual Automatic Temperature Control (DATC) module, depending on which side of the heater core warm coolant is to flow through.
Possible Causes
- An open in circuit 30-FB3 (RD/OG), 91S-FB3 (BN/BL) or 91S-FB4 (BN/GN).
- A short to ground or voltage in circuit 91S-FB3 (BN/BL) or 91S-FB4 (BN/GN).
- Coolant control valve.
- DATC module.
- Evaporator discharge air temperature sensor.
- Thermostat.