Test G
PINPOINT TEST G: THE POWER SUPPLY RELAY IS INOPERATIVE - SWITCHED SYSTEM POWER (SSP)1Test G1-G3:
Normal Operation
Battery voltage is supplied to the SSP1 relay through battery junction box (BJB) fuse 27 (30A). Ground for the relay coil is controlled by the front electronic module (FEM) and the rear electronic module (REM) through circuit 31S-DG51 (BK/YE). When the SSP1 relay is energized, battery voltage is switched from the BJB to circuit 30-DD3 (RD/OG).
Possible Causes
- circuit 31S-DG51 (BK/YE) open
- circuit 30-DD3 (RD/OG) open
- BJB
- SSP1 relay