Pinpoint Test 2
PINPOINT TEST 2: THE INSTRUMENT CLUSTER ILLUMINATION IS INOPERATIVEStep 1:
Step 2-Step 3:
Normal Operation
Variable voltage is supplied to the instrument cluster from the instrument panel dimmer switch on circuit (L/W). The instrument cluster is grounded through circuit (B/Y).
Possible Causes
Circuit (LAN) open
- Circuit (B/Y) open
- Instrument cluster
CAUTION: Use the correct probe adaptor(s) when making measurements. Failure to use the correct probe adaptor(s) may damage the connector.