Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace10.57.5AIncludes: R&R Cylinder Head & Oil Pan. Hone Cylinders & Plastigauge Bearings.
Add Following Operations If Performed With Pstn & Ring Jobs
Main Bearings, Renew
Manual Trans7.40.0AAdd Any Of The Following Operations If Performed Along With Piston Or Ring Jobs
Auto Trans7.60.0AAdd Any Of The Following Operations If Performed Along With Piston Or Ring Jobs
Crankshaft, Renew
Manual Trans7.40.0AAdd Any Of The Following Operations If Performed Along With Piston Or Ring Jobs
Auto Trans7.60.0AAdd Any Of The Following Operations If Performed Along With Piston Or Ring Jobs
Oil Pump, Renew1.90.0AAdd Any Of The Following Operations If Performed Along With Piston Or Ring Jobs
Timing Chain, Renew3.50.0AAdd Any Of The Following Operations If Performed Along With Piston Or Ring Jobs
Tune-Up0.50.0AAdd Any Of The Following Operations If Performed Along With Piston Or Ring Jobs
Note
With Ac, Add0.20.1A