| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace | 14.1 | 10.1 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders & Plastigauge Bearings. |
| Add Following Operations If Performed With Pstn & Ring Jobs |
| Crankshaft, Renew | 8.0 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Main Bearings, Renew | 8.0 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Oil Pump, Renew | 1.7 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Timing Belts. Renew | 0.7 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |