| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
Replace | 15.3 | 10.9 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders & Plastigauge Bearings. |
Add Following Operations If Performed With Pstn & Ring Jobs |
Main Bearings, Renew | 8.0 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
Crankshaft, Renew | 8.0 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
Oil Pump, Renew | 1.7 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
Timing Belts. Renew | 0.7 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |