Operation CHARM: Car repair manuals for everyone.

Pick-Up Coil: Testing and Inspection

Fig. 2 Disassembled View Of Breakerless Type Distributor. Non-turbocharged:





1. Connect an ohmmeter to the pick-up coil Fig. 2.
2. Measure the resistance (900-1,200 ohms).
3. If not within specification, replace it.