| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace | 10.1 | 7.2 | A | Includes: R&R Cylinder Head & Oil Pan. Hone Cylinders & Plastigauge Bearings. |
| Add Following Operations If Performed With Pstn & Ring Jobs |
| Crankshaft, Renew |
| Manual Trans | 7.4 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston Or Ring Jobs |
| Auto Trans | 7.6 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston Or Ring Jobs |
| Main Bearings, Renew |
| Manual Trans | 7.4 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston Or Ring Jobs |
| Auto Trans | 7.6 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston Or Ring Jobs |
| Oil Pump, Renew | 1.9 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston Or Ring Jobs |
| Timing Chain, Renew | 3.5 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston Or Ring Jobs |
| Tune-Up | 0.5 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston Or Ring Jobs |
| Note |
| With Ac, Add | 0.2 | 0.1 | A | |