Evaporative Emissions System: Testing and Inspection
1987---88 RX-7
1. Disconnect ventilation hose from canister and connect a suitable hand vacuum pump to the hose.
2. Apply vacuum to hose and ensure no vacuum is held.
3. If vacuum is held, ensure proper operation of check and cut valve and inspect evaporation pipe for blockage. Repair or replace as necessary.