Operation CHARM: Car repair manuals for everyone.

No-Load Test

Fig. 6 No-load Test Connections:





1. After adjusting pinion gap, form a test circuit as in Fig. 6 using a voltmeter and an ammeter. Use heavy gauge wire and tighten terminals fully.
2. Close switch K to run starter, voltage and ammeter readings, refer to Starting and Charging/Starting System/Specifications for specifications.