Ignition Control Module: Testing and Inspection
1. Measure voltage at each PCME terminal listed below. Refer to Computers and Control Systems.
^ 2F (igniter)
^ 2E (distributor NE signal)
^ 2G (distributor G signal)
2. Check condition of connector, distributor, ignition coil, and high tension leads.
3. If all are normal, but misfire still occurs, replace igniter/distributor as an assembly.