Operation CHARM: Car repair manuals for everyone.

Cranking Signal: Testing and Inspection

PREPARATION
Connect the special service tools (SST) to the powertrain control module engine (PCME).

SST Engine Signal Monitor-49 9200 162 And Harness Adapter-49 G018 903:





1. Connect the SST engine signal monitor between the PCME and the vehicle's PCME connector by using the SST adapter harness.

SST Sheet Overlay-49 G018 904:





2. Place the SST engine signal sheet overlay on the SST engine signal monitor.
3. Measure voltage at terminal 1C under the following conditions.

Condition:--Ignition key-ON.
Voltage:--0.0 Volts.

Condition:--While cranking.
Voltage:--Cranking battery voltage (approx. 10 Volts.)

If readings are not as shown, then inspect the ignition switch, the wiring between the ignition switch and PCME terminal 1C.