Operation CHARM: Car repair manuals for everyone.

With Manual Transaxle (MTX)



PREPARATION
1. Warm up the engine to normal operating temperature.
2. Shift the transaxle into Neutral.
3. Turn off all electrical loads.
- Headlight
- Blower
- Rear window defroster
- Power steering
4. Wait until the cooling fan stops.

New Generation Star (NGS) Tester Connected To DLC-2:




5. Connect the Special Service Tools (SST)s New Generation Star (NGS) tester to the data link connector-2 and select the PID/DATA MONITOR AND RECORD" function.




IGNITION TIMING
1. Perform Preparation. (Refer to above.)
2. Verify that the idle speed is within the specification.

Idle speed: 650-750 rpm

3. If not within the specification, adjust the idle speed.




4. Connect the SST (System Selector) to the data link connector.
5. Set switch A to position 1.
6. Set the test switch to SELF TEST.
7. Verify that the idle speed is within the specification.

Idle speed (SELF TEST MODE): 500-800 rpm




8. Connect a timing light to the high-tension lead of No.1 cylinder.
9. Verify that the timing mark (yellow) on the crankshaft pulley and the mark on the timing belt cover are aligned.

Ignition timing: BTDC 11-13° (12 ± 1°)




10. If the marks are not aligned, loosen the distributor lock bolts and turn the distributor to make the adjustment.
11. Tighten the distributor lock bolts to the specified torque.

Tightening torque: 19-25 Nm (14-18 ft. lbs.)

12. Disconnect the SSTs.
13. Verify that the ignition timing is within the specification.

Ignition timing: BTDC 6-18°