With Manual Transaxle (MTX)
Distributor R & R FS (MTX):
REMOVAL / INSTALLATION
1. High-tension lead
2. Connector
3. Distributor
INSTALLATION NOTE
1. Verify that the No.1 cylinder is at top dead center and the distributor matching marks are aligned.
Installation Note FS:
2. Install the distributor and connect the high-tension leads and distributor connector.
3. Tighten the locknut or bolts to the specified torque.
Tightening torque: 19-25 Nm (14-18 ft.lbs.)