Using the NGS
INSPECTION PROCEDURECAUTION: Do not connect the NGS to the data link connector 2 when EC-AT tester is connected to the power- train control module. Doing so can cause incorrect test results.
NGS:
1. Assemble the SST (NGS).
2. Select the PID/DATA MONITOR AND RECORD function.