Operation CHARM
: Car repair manuals for everyone.
Home
>>
Mazda
>>
1998
>>
Millenia V6-2.5L DOHC
>>
Repair and Diagnosis
>>
Powertrain Management
>>
Tune-up and Engine Performance Checks
>>
Ignition Cable
>>
Testing and Inspection
Ignition Cable: Testing and Inspection
1.
Measure the resistance of the high-tension leads.
Specification
16 K Ohm per 1.00 m {3.28 ft}
2.
If not as specified, replace the high-tension lead.