Clutch Switch: Testing and Inspection
NOTE: Perform the following test only when directed.1. Verify that the clutch switch is installed properly.
2. Disconnect the negative battery cable.
3. Remove the clutch switch. (See CLUTCH PEDAL REMOVAL/INSTALLATION.)
Specifications:
4. Inspect the continuity between the clutch switch terminals using an ohmmeter.
- If not as specified, replace the clutch switch.
- If the clutch switch is okay, but PID value or PCM terminal 6 voltage are out of specification, carry out the "Circuit Open/Short Inspection".
Circuit Open/Short Inspection
1. Remove the PCM.
2. Connect the SST (104 Pin Breakout Box) to the PCM as shown.
3. Tighten the connector attaching screw.
Tightening torque
7.9 - 10.7 N.m {80 - 110 kgf.cm, 69.5 - 95.4 in.lbf}
4. Inspect for an open or short circuit in the following wiring harnesses by probing the applicable sensor and SST (104 Pin Breakout Box) terminals with ohmmeter leads.
- If there is an open or short circuit, repair or replace wiring harnesses.
- If there is no open or short circuit, replace the clutch switch.
Open circuit
- Signal circuit (Clutch switch connector terminal B and PCM connector terminal 6 through common connector)
- GND circuit (Clutch switch connector terminal A and GND)
Short circuit
- Signal circuit (Clutch switch connector terminal B and PCM connector terminal 6 through common connector to GND)
5. Install the clutch switch.