Daytime Running Lamp Control Unit: Testing and Inspection
DRL CONTROL MODULE INSPECTION (CANADA)1. Remove the bracket and pull it toward you.
Terminal Voltage List/Pinouts Part 1:
Pinouts Part 2:
2. Measure the voltage at the DRL control module terminals as indicated.
3. Disconnect the DRL control module connector before inspecting for continuity at terminal 1 E.
- If not as specified, inspect the parts listed under "Action."
- If the parts and wiring harnesses are okay but the system still does not work properly, replace the DRL control module.