Input & Turbine Speed Sensor Inspection
INPUT/TURBINE SPEED SENSOR INSPECTION [JA5A-EL]On-Vehicle Inspection
1. Disconnect the negative battery cable.
2. Disconnect the terminal component No.2 connector
3. Measure resistance between terminals E and F.
If not as specified, inspect individual part.
Resistance (ATF temperature: 20°C (68°F)) 513 - 627 ohms
4. Connect the terminal component No.2 connector.
Inspection of Individual Part
1. Remove the input/turbine speed sensor.
2. Measure resistance between the terminals of the input/turbine speed sensor.
^ If not as specified, replace the input/turbine speed sensor.
^ If it is normal, replace the harness.
Resistance (ATF temperature: 20°C (68°F)) 513 - 627 ohms
3. Install the input/turbine sensor.