Operation CHARM: Car repair manuals for everyone.

Variable Tumble Shutter Valve Switch Inspection

VARIABLE TUMBLE SHUTTER VALVE SWITCH INSPECTION

NOTE: Perform the following inspection only when directed.

Voltage Inspection
1. Turn the ignition switch to the ON position (Engine off).










2. Verify that the PCM terminal 2AE voltage is as shown in the table when the variable tumble shutter valve actuator rod is depressed and released by hand.
- If not as specified, perform the "Circuit Open/ Short Inspection".
- If there is no open or short circuit, replace the intake manifold.

Circuit Open/Short Inspection




1. Disconnect the PCM connector.
2. Inspect the following harness for an open or short wiring. (Continuity inspection)

Open circuit
- If there is no continuity, there is an open circuit. Repair or replace the wiring harness.
- Variable tumble shutter valve switch terminal A and PCM terminal 2W
- Variable tumble shutter valve switch terminal B and PCM terminal 2AA
- Variable tumble shutter valve switch terminal C and PCM terminal 2AE

Short circuit
- If there is continuity, there is a short circuit. Repair or replace the wiring harness.
- Variable tumble shutter valve switch terminal A and power supply
- Variable tumble shutter valve switch terminal A and body GND
- Variable tumble shutter valve switch terminal B and power supply
- Variable tumble shutter valve switch terminal C and power supply
- Variable tumble shutter valve switch terminal C and body GND