Main Relay Operation Inspection
Main Relay Operation Inspection1. Verify that the main relay clicks when the ignition switch is turned to ON position and off.
- If there is no operation sound, inspect the following:
- Main relay.
- Harness and connector between ignition switch and main relay terminal A.
- Harness and connector between PCM terminal 10 and main relay terminal E.