Operation CHARM: Car repair manuals for everyone.

Steering: Service Precautions

GENERAL PROCEDURES (STEERING)

Wheel and Tire Installation





1. When installing the wheels and tires, tighten the wheel nuts in a criss-cross pattern to the following tightening torque.
Tightening torque 88 - 118 Nm (9.0 - 12.0 kgf-m, 65.0 - 87.0 ft. lbs.)

Power Steering Components Removal/Installation
1. If any power steering fluid line has been disconnected anytime during the procedure, add ATF M-III, M-V or equivalent (e.g. Dexron(R)III), bleed the fluid lines, and inspect for leakage after the procedure has been completed.

Connector Disconnection
1. Disconnect the negative battery cable before performing any work that requires handling of connectors.

Suspension Arm Removal/Installation
1. Tighten any part of the suspension that uses rubber bushings only after vehicle has been lowered to the ground and unloaded.

Note:
^ Unloaded: Fuel tank is full. Engine coolant and engine oil are at specified level. Spare tire, jack, and tools are in designated position.