4. Mainshaft Inspection
Mainshaft Inspection1. Hold the mainshaft with the V-blocks and measure the runout using a dial gauge as shown in the figure.
Maximum runout 0.03 mm (0.0012 inch)
^ If it exceeds the maximum specification, replace the mainshaft.