Power and Ground Distribution: Testing and Inspection
RELAY INSPECTIONRelay Inspection:
Type A
1. Verify the continuity between the relay terminals.
- If not as indicated in the table, replace the relay.
Type B
1. Verify the continuity between the relay terminals.
- If not as indicated in the table, replace the relay.