Oil Control Valve (OVC) Removal/Installation
OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [L3 WITH TC]1. Remove the battery cover.
2. Disconnect the negative battery cable.
3. Remove the charge air cooler.
4. Remove the ignition coils.
5. Disconnect the wiring harness.
6. Remove the ventilation hose.
7. Remove the cylinder head cover.
8. Remove the OCV.
9. Install the OCV.
Tightening torque 8.0-11.5 N-m (82-117 kgf-cm, 71-101 in-lbf)