[FN4A-El] Automatic Transmission/Transaxle
SOLENOID VALVE REMOVAL/INSTALLATION [FN4A-EL]1. Remove the battery duct and battery cover.
2. Disconnect the negative battery cable.
3. Remove the under cover.
4. Remove the control valve body.
5. Remove the solenoid valve (s).
6. Apply ATF to a now O-ring and install it on the solenoid valve.
7. Install the solenoid valve in the control valve body.
Tightening torque 7.8-10.8 N-m (80-110 kgf-cm, 69.5-95.4 in-lbf)
8. Install the control valve body.
9. Install the under cover.
10. Connect the negative battery cable.
11. Install the battery duct and battery cover.
12. Add ATF and, with the engine idling, inspect the ATF level and inspect for leakage. (See AUTOMATIC TRANSAXLE FLUID (ATF) INSPECTION [FN4A-EL].) Automatic Transaxle Fluid (ATF) Inspection
13. Perform the mechanical system test. (See MECHANICAL SYSTEM TEST [FN4A-EL].) Mechanical System Test