Operation CHARM: Car repair manuals for everyone.

Variable Induction Position Sensor: Testing and Inspection




VARIABLE TUMBLE SHUTTER VALVE SWITCH INSPECTION [L5]

1. Connect the M-MDS to the DLC-2.






2. Switch the ignition to ON.

3. Verify that the voltage (M-MDS PID: IMRC_POS) within the specification. Component Tests and General Diagnostics

- If not as specified, replace the intake manifold.
Service and Repair