Initial Inspection and Diagnostic Overview
TCS OFF SWITCH INSPECTION
1. Remove the TCS OFF switch. TCS Off Switch Removal/Installation
2. Verify that the continuity between the TCS OFF switch terminals is as indicated in the table.
- If not as indicated in the table, replace the TCS OFF switch.
3. Apply battery voltage to TCS OFF switch terminal E, and connect terminal A to ground.
4. Verify that the LED illuminates.
- If there is any malfunction, replace the TCS OFF switch.