Solenoid Valve Removal/Installation (Primary Control Valve Body) - FS5A-EL
SOLENOID VALVE REMOVAL/INSTALLATION (PRIMARY CONTROL VALVE BODY) [FS5A-EL]
1. Remove the battery cover. Removal and Replacement
2. Disconnect the negative battery cable.
3. Remove the under cover.
4. Drain the ATF.
5. Remove the oil pan.
6. Remove the primary control valve body. Primary Control Valve Body Removal - FS5A-EL
7. Remove the solenoid valve(s).
8. Apply ATF to a new O-ring and install it on the solenoid valve.
9. Install the solenoid valve in the primary control valve body.
Tightening torque
- 7.8-10.8 Nm
{80-110 kgf-cm, 70-95.4 in-lbf}
10. Install the primary control valve body. Primary Control Valve Body Installation - FS5A-EL
11. Install the oil pan before the applied sealant starts to harden. Primary Control Valve Body Installation - FS5A-EL
12. Install the under cover.
13. Connect the negative battery cable.
14. Install the battery cover. Removal and Replacement
15. Add ATF. Procedures
16. Perform the mechanical system test. Mechanical System Test
17. Perform the road test. Road Test