Operation CHARM: Car repair manuals for everyone.

Assembly Procedure

Assembly procedure
1. Measure the spring free length.

Secondary control valve body spring (standard)





^ If not as specified, replace the springs.





2. Install the 4-5 shift valve B, 4-5 shift valve A, 4-5 shift valve spring and retainer.