Secondary Control Valve Body Installation - FS5A-EL
SECONDARY CONTROL VALVE BODY INSTALLATION [FS5A-EL]
On-Vehicle Installation
1. Install the tubular pin and new O-ring to the transaxle case.
2. Install the secondary control valve body component and ground.
Tightening torque
- 7.8-10.8 Nm
{80-110 kgf-cm, 70-95 in-lbf}
Bolt length (measured from below the head)
- B: 40 mm {1.575 in}
- C: 50 mm {1.967 in}
3. Match the connector colors, then connect the solenoid connector.
4. Apply a light coat of silicon sealant to the contact surfaces of the oil cover and transaxle case.
5. Install the oil cover.
Tightening torque
- 7.8-10.8 Nm {80-109 kgf-cm, 70-95 in-lbf}
6. Install the battery, battery box and battery tray. Removal and Replacement
7. Connect the negative battery cable.
8. Install the battery cover. Removal and Replacement
9. Add ATF. Procedures
10. Carry out the mechanical system test. Mechanical System Test
11. Carry out the road test. Road Test