Procedures
ENGINE DISASSEMBLY/ASSEMBLY [MZR 2.0, MZR 2.5]
1. Remove the engine from the transaxle. (See G35M-R (5MTX).) (See G66M-R (6MTX).) (See Automatic Transaxle Removal/Installation (ATX).)
2. Remove the generator. Removal and Replacement
3. Remove the exhaust system. Service and Repair
4. Remove the EGR valve. Service and Repair
5. Remove the intake-air system. Service and Repair
6. Remove the fuel injectors. Service and Repair
7. Remove the ignition coils. Service and Repair
8. Remove the crankshaft position (CKP) sensor. Service and Repair
9. Disassemble in the order indicated in the table.
10. Assemble in the reverse order of disassembly.
MZR 2.0
MZR 2.5